Beyond the dust of Liverpool’s dock road and the huge lorries rolling in and out of the city’s port, the glass panels of Everton’s new home at the Bramley-Moore Dock sparkle impressively, radiating ambition.
The site, expected to open next year, is a feat of engineering considering the narrow dimensions of the fresh land below it, where old waters have been drained to create a 52,888-capacity arena that has been earmarked to host matches at the 2028 European Championship.
Advertisement
The Everton Stadium, as it is currently known, has been nearly 30 years in the making and nothing about its construction has been straightforward. There were three other proposed sites — including
→ Continue reading at The New York Times Sports